PVC Drainage Pipe

               PVC pipe drains are sanitary grade polyvinyl chloride (PVC) resin as the main raw material, adding a proper amount of stabilizer, lubricant, filler, color-enhancing agent, etc. by plastic extruder extrusion molding and injection molding machine injection molding, through cooling, solidification, stereotypes, testing, packaging and other processes to complete the production of pipe, pipe fittings.Drainage Pipe

               Solution of leakage of PVC drainage pipe 1, first with a small hacksaw to the leaking place saw off-the saw to be flat. 2, with sandpaper to the newly exposed port gently polished, not too much. 3. Wipe the port clean with a clean cloth. 4, with special glue on the port, slightly dry for a while, at this time in the ' bamboo ' joints coated with glue. 5, the port and the ' bamboo ' connection, to rotate repeatedly, until firmly. The same way to connect the other end. 6, all OK after the seams at the right amount of glue, to ensure that no leakage.Drainage Pipe

                Installation and construction process of PVC pipe (1) The general laying process of the pipeline is divided into five steps, the first step is to put the pipe into the groove, the second step to the interface, the third step is partial backfill, the fourth step is the test pressure, the last step is all backfill. When the pipe is put into the groove, only if the condition is not allowed and the diameter of the pipe is small, it can be carried out, when the condition is satisfied, 3 pipes are connected on the groove and then smoothly into the groove. (2) When laying the water supply pipe in the trench, when the design does not stipulate that other materials must be used, it should generally be laid on undisturbed soil. (3) After the pipeline is installed, the cushion used for laying the pipe should be removed in time.Drainage Pipe